Construction on CNC’s new campus should begin spring 2019, according to the college. Tim Collins/file photo

Concept designs for Vanderhoof’s new CNC campus unveiled

Community was invited to provide feedback at a public engagement session Dec. 6

The first glimpse of the College of New Caledonia’s (CNC’s) proposed new campus and trades shop design was unveiled last night, Dec. 6, at a public engagement session at the new campus building.

A conceptual design of the first and second floor of the new campus, as well as the trades shop, was unveiled, and attendees had a chance to provide feedback and ask questions.

A dedicated trade shop was a highlight of the new campus’ conceptual design. The proposed 357 square metre shop will diversify the trades training opportunities available in the Nechako region.

“We heard some great feedback at the session,” said CNC Nechako Regional Principal Troy Morin. “The community certainly showed its passion for the future of education in Vanderhoof.”

The conceptual design also features two Digital Delivery Instruction (DDI) classrooms. These learning spaces, which use state-of-the-art cameras and microphones to create an interactive digital classroom, are already bringing a wide range of courses for university transfer that have never been accessed by the community before.

Currently, students in Vanderhoof can enrol in 28 courses using DDI including Bookkeeping, English and Early Childhood Care and Learning for the spring 2018 semester.

“We’re able to offer a lot of programming in Vanderhoof using one DDI classroom,” Morin said. “The opportunities can only grow with the addition of a second.”

The college said feedback gathered from the community during the evening’s breakout sessions will be taken into consideration as the renovation project moves forward.

A design consultant and construction manager should be hired by the end of January 2019, according to the college, with demolition and preparation of the site for construction happening over the winter.

Preliminary construction will begin spring 2019 and final touches will be applied by fall next year, ready for classes to begin in the new campus in January 2020.

“CNC greatly values the communities it serves,” said CNC President Henry Reiser. “Through this project, we wanted to create a campus with modern up-to-date classrooms and support spaces to enhance the teaching and learning environment in Vanderhoof. It is important the community is involved in defining what that is.”

READ MORE: Renovations to CNC campus in Vanderhoof announced

Just Posted

Fires still burning near Telegraph Creek

BC Wildfire Service assures residents of a proactive plan heading into wildfire season

Northwest entrepreneurs pitch their plans for cash prizes

ThriveNorth announces 12 finalists in this year’s business challenge

Gas prices spike in northern B.C. ahead of the long weekend

Fuel went up 17 cents overnight in Prince Rupert

Cyclist braking stigma on addiction from coast to coast

Mathew Fee aims at world record for longest distance on BMX bike while sharing his story of recovery

VIDEO: Alberta man creates world’s biggest caricature

Dean Foster is trying to break the world record for a radio show contest

B.C. RCMP receive application for Police Cat Services

RCMP announced the launch of the Police Cat Services unit as an April fools joke

Kirkland Signature veggie burgers recalled due to possible metal fragments

Recalled products came in 1.7 kg packages with a best before date of Apr. 23, 2019

Chaos at the ferry terminal for people heading from Vancouver to the Island

Easter crowds create backlog at Tsawwassen ferry terminal

Parents of 13 who tortured children get life after hearing victims

One of their daughters fled their home and pleaded for help to a 911 operator

Flooding, climate change force Quebecers to rethink relationship with water

Compensation for victims of recurring floods limit to 50% of a home’s value, or a maximum of $100,000

Storms blast South, where tornadoes threaten several states

9.7 million people in the Carolinas and Virginia at a moderate risk of severe weather

Private cargo ship brings Easter feast to the space station

There are three Americans two Russians and one Canadian living on the space station

Notre Dame rector: “Computer glitch” possible fire culprit

The fire burned through the lattice of oak beams supporting the monument’s vaulted stone ceiling

Most Read